|
Accoda (Rail) Ltd. awarded new contract to digitise additional sections of railway infrastructure.
Following extensive trials and negotiations, Accoda (Rail) Ltd. is to digitise another TDM system in the Chepstow area, by installing a series of ADU2048-MP units on an existing multi-point TDM system.
The implementation of this project, will mean greatly enhanced reliability of the TDM system and the removal of a reliance on track side copper wire transmission.
The new ADU2048-MP implementation converts TDM and other analogue systems to run over ultra-reliable, fault tolerant, digital infrastructure.

For more information on the above or place a general enquiry, please click here, or follow the links to the left. |